FAQ's What's New? Careers & Employment Newsletters Newsletter Sign Up
Industrial Process & Specialty Systems Process Cooling Water Systems Commercial HVAC Pumping & Heat Transfer Systems Modular Chiller & HW Boiler Plants Hot Water Heating Systems Boiler Room, Steam & Condensate Systems Domestic Water Booster Pump Systems Wastewater Heat Recovery ASME Pressure Vessels & Custom Systems Electrical PLC & Controls Process Engineering & Custom Solutions Private Label Systems
PICS: Industrial Process & Specialty Systems PICS: Process Cooling Water Systems PICS: Commercial HVAC Pumping & Heat Transfer Systems PICS: Modular Chiller & HW Boiler Plants PICS: Hot Water Heating Systems PICS: Boiler Room, Steam & Condensate Systems PICS: Domestic Water Booster Pump Systems PICS: Wastewater Heat Recovery PICS: ASME Pressure Vessels & Custom Systems PICS: Electrical PLC & Controls
Company Overview (PDF) Line Card (PDF) Technical Library
Welcome to EnviroSep!
Phone: 843-546-7400
Providing Integrated Solutions, Worldwide, for Fluids Handling, Heat Transfer & Energy Recovery
| site map

your location: » home » products » Boiler Room, Steam & Condensate Systems » Model MBURO Cost Justifications and Calculated Savings

Model MBURO Cost Justifications and Calculated Savings

Use the calculator below for easy systems savings figures. Calculations are for approximations only.

Inputs

Steam Flow Rate:

lbs. / hr
Condensate Return (% of Total): %
Condensate Return TDS mmhos / cm
Make-up Water (% of Total) %
Make-up Water TDS mmhos / cm
Required Boiler Conductivity mmhos / cm
(normal range 2,500 to 2,800 mmhos / cm )  
Fuel Cost $ / klbs. of steam
Water / Wastewater Cost $ / Mgal
Savings Calculation Display
Fuel Savings $ / hr
Annual Fuel Savings $ / yr
Water Savings $ / hr
Annual Water Savings $ / yr
Total Annual Savings $ / yr

.

These calculations are for approximation only.

Boiler Make-up Water
Reverse Osmosis System

Case Study

A 30,000 lb/hr steam system had a Boiler Blowdown rate of 6% and Make-up Conductivity was 600 mmhos/cm. Make-up Alkalinity was 320 mg/l. Condensate Return was 60%, therefore, feedwater Conductivity was 240 mmhos/cm. By installation of the Model BMURO system, the Make-up Water to the Boiler system was improved to 30 mmhos/cm Conductivity. The resulting Boiler Blowdown rate was reduced to 0.3% while maintaining a Boiler Water Conductivity of 3,200 mmhos/cm. The below listed savings were achieved by the decrease in Boiler Blowdown rate.
  • Annual Fuel Savings ($7.00/MMBTU) = $ 33,506
  • Annual Water / Wastewater Savings ($3.00/Mgal) = $ 5,166
  • TOTAL ANNUAL SAVINGS = $ 38,672
    Note: Boiler Chemical Savings are in addition to the above savings.

For more information on how EnviroSep can provide your company with an Integrated Solution for your Fluids Handling, Heat Transfer, and/or Energy Recovery needs, use our quick & easy Online Quote Request Form, call our main office at 843-546-7400 (you can fax us at 843.546.7407) or